Leg Matching Unit(LMU)
    Publish time 2024-09-06 16:14    

Suitable for upper modules of offshore engineering with float-over installation

Leg Matching Unit(LMU)

LEG MATING UNIT(LMU)


The Leg Matching Unit (LMU) is primarily used in the float-over installation process to reduce the impact force between the upper and lower structures and to limit the relative displacement between them. It effectively mitigates the impact of the module on the jacket pile, allowing the module to be smoothly positioned on the jacket pile. After positioning, the LMU is then welded together with the jacket pile and the module, becoming part of the platform's leg load-bearing structure.

The LMU not only acts as a soft spring but also suppresses the overall motion of the installation barge or vessel. It is an indispensable key technology in the platform's float-over installation and plays a crucial role.

Product Features:
Reduces offshore installation construction time, decreasing project construction risks.
Reduces installation construction costs.
The rubber compound formula has been repeatedly verified through experiments and testing; the structure is stable and reliable.
Utilizes software for integrated structural design and force simulation simulation, ensuring product performance during the force application process.
Product Type:



For any technical issues,
Please contact DSMEC via Email: info@dsmecindustries.comm